Awesome Image

Coreys Contracting recently completed an elegant asphalt driveway installation for a residential property located in Oakville, Ontario. This project involved the complete removal of the existing driveway surface, meticulous grading to ensure proper water drainage, and the installation of a durable sub-base layer. Our team used laser-guided equipment to achieve precise grading, followed by thorough compaction and proof rolling to ensure stability.

The new driveway was paved with a strong binder layer of large aggregate mixed with asphalt oil, 
topped with a smooth surface layer composed of fine aggregate and sand. Special attention was given to 
creating seamless butt joints where the driveway meets the existing garage entrance and sidewalk, 
ensuring smooth transitions and an attractive finish. The final result is a sleek, jet-black asphalt 
driveway that enhances curb appeal and provides long-lasting durability.

Coreys Contracting recently completed an elegant masonry walkway project at a residential home in Vancouver, British Columbia. The homeowners requested a classic yet modern look to complement their home’s architecture. Our skilled masons carefully selected natural stone pavers in warm earth tones, meticulously laid out in an intricate herringbone pattern.

The project included:

  • Excavation and preparation of the walkway area

  • Installation of a robust gravel sub-base for frost protection

  • Precise laying of natural stone pavers with high-quality mortar

  • Finishing touches including custom edging and sealing to protect against weather conditions

The final result is a beautiful stone walkway that seamlessly integrates with the home’s landscape design, adding value and aesthetic appeal.

Our skilled masons carefully selected pavers that complemented the home’s exterior color scheme. We also installed proper drainage systems beneath the patio area to prevent water accumulation. The finished patio is both visually appealing and highly functional—perfect for outdoor gatherings and relaxation.

 

Project Information

  • Client:
    Michal Jorden
  • Asphalt
    Construction, DEVELOPMENT
  • Start Date:
    10 Jan, 2025
  • End Date:
    15 Jan 2025

  • NA
    Budget: